Installer quote checklist

Ask every installer the same questions so you can compare quotes line by line.

Tick as you go and write the answer for each installer on the line. Ticks are not saved: print it, or keep the tab open.

The system

  • So you can check the kWp and look up the datasheet.
  • Under 40 kWp to qualify for the 15c feed-in tariff.
  • A hybrid inverter can take a battery later.
  • Usable, not nominal, capacity.
  • Check it against the production chart.
  • Compare it with the savings calculator.
  • PVGIS does not see these.

Timing

Price and paperwork

  • Grants count the cost including VAT.
  • Avoids surprises on the day.
  • Applications go in before you buy.
  • A condition of the 2026 grant.
  • A warranted electrician must certify any grid connection.

Warranties and service

  • Typical: 0.4% a year after the first year.
  • See panel maintenance.

A checklist, not advice. Rules as of 22 November 2026; they change, so confirm grant and feed-in conditions with REWS. See also the step-by-step guide and regulations and permits.