{"retrieved":"2026-11-22","note":"Every value was read from the source URL on the retrieval date. status: verified = read in the primary source; derived = computed from verified inputs (formula given); range = spread across cited sources; unverified = could not be confirmed in a primary source.","tariff":{"residential_bands_eur_per_kwh":{"value":[{"from":0,"to":2000,"rate":0.1047},{"from":2001,"to":6000,"rate":0.1298},{"from":6001,"to":10000,"rate":0.1607},{"from":10001,"to":20000,"rate":0.342},{"from":20001,"to":null,"rate":0.6076}],"unit":"EUR/kWh, incl. 5% VAT, cumulative annual kWh","status":"verified","source":"https://www.enemalta.com.mt/13797-2/","retrieved":"2026-11-22","notes":"Applies to a Residential Premises Service (someone registered at the address). Bands are applied pro rata to the days covered by each bill (REWS 2026 Monitoring Report, s.3.2.2(a)ii)."},"domestic_bands_eur_per_kwh":{"value":[{"from":0,"to":2000,"rate":0.1365},{"from":2001,"to":6000,"rate":0.1673},{"from":6001,"to":10000,"rate":0.2023},{"from":10001,"to":20000,"rate":0.418},{"from":20001,"to":null,"rate":0.686}],"unit":"EUR/kWh, incl. 5% VAT","status":"verified","source":"https://www.enemalta.com.mt/domestic-property-services/","retrieved":"2026-11-22","notes":"Domestic Premises Service (dwelling with nobody registered, e.g. second home). Same band limits."},"service_charge_single_phase":{"value":65,"unit":"EUR/year incl. VAT","status":"verified","source":"https://www.enemalta.com.mt/13797-2/","retrieved":"2026-11-22","notes":"Same for domestic (Enemalta domestic page)."},"service_charge_three_phase":{"value":195,"unit":"EUR/year incl. VAT","status":"verified","source":"https://www.enemalta.com.mt/13797-2/","retrieved":"2026-11-22"},"max_demand_tariff":{"value":21.05,"unit":"EUR per kW of maximum demand per year","status":"verified","source":"https://www.enemalta.com.mt/13797-2/","retrieved":"2026-11-22","notes":"Only three-phase services above 60 A per phase."},"vat_rate":{"value":0.05,"status":"verified","source":"https://www.enemalta.com.mt/13797-2/","retrieved":"2026-11-22","notes":"Already included in all published rates; do not add again."},"excise_duty":{"value":0.0015,"unit":"EUR/kWh","status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/09/2026-Malta-National-Report.pdf","retrieved":"2026-11-22","notes":"Included in the household tariffs (REWS 2026 Monitoring Report)."},"eco_reduction":{"value":{"single_person":{"discount":0.25,"condition":"annual consumption < 2000 kWh, on all consumption"},"two_or_more":{"tier1":{"discount":0.25,"kwh_per_person":1000},"tier2":{"discount":0.15,"kwh_per_person":750},"condition":"lost if consumption exceeds 1750 kWh per person per year"}},"status":"verified","source":"https://www.enemalta.com.mt/13797-2/","retrieved":"2026-11-22","notes":"Primary residence, Residential Premises Service only. Applied to the consumption charge, pro rata over the billing period. Enemalta text reads '25% on the first 1,000 units, 15% on the remaining 750 units'; REWS report reads these as per person. Confirm the per-person reading with ARMS."},"tariff_unchanged_2025":{"value":true,"status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/09/2026-Malta-National-Report.pdf","retrieved":"2026-11-22","notes":"'During the year under review there were no changes in the retail tariffs.' Enemalta pages last modified 6 Feb 2026."},"eurostat_avg_price_band_DC":{"value":{"2024-S1":0.1272,"2024-S2":0.1303,"2025-S1":0.1261,"2025-S2":0.1296,"2026-S1":0.1268},"unit":"EUR/kWh all taxes, households 2500-4999 kWh/yr","status":"verified","source":"https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nrg_pc_204?geo=MT&nrg_cons=KWH2500-4999&unit=KWH&tax=I_TAX&currency=EUR","retrieved":"2026-11-22","notes":"2026-S1 provisional. Cross-check only; the tools use the band table."}},"feed_in_tariff":{"fit_no_grant":{"value":0.15,"unit":"EUR/kWh exported","duration_years":20,"status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/FIT-Schemes-table_29April26.pdf","retrieved":"2026-11-22","notes":"REWS FIT Scheme Table (updated 29 Apr 2026): approval period 1 Jan 2026 to 30 Nov 2026, PV >=1 kWp and <40 kWp, any location, no grant or other De Minimis support on the capital investment, S.L.545.27 as amended by LN 101 of 2026. The 2026 approval window ends 30 Nov 2026; a 2027 scheme was not published on rews.org.mt on the retrieval date."},"fit_scheme_capacity_2026":{"value":8,"unit":"MWp (12.8 GWh/yr)","status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/FIT-Schemes-table_29April26.pdf","retrieved":"2026-11-22"},"fit_with_grant":{"value":0.105,"unit":"EUR/kWh","duration_years":20,"status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/FIT-Schemes-table_29April26.pdf","retrieved":"2026-11-22","notes":"Only for new PV approved with a grant under the 2025 (and earlier) RES rounds. Not available with a 2026 grant: the 2026 grant requires no active FiT allocation (REWS 2026 scheme page)."},"export_cap_kwh_per_kwp":{"value":1600,"unit":"kWh exported per kWp per year paid at the FiT","status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/FIT-Schemes-table_29April26.pdf","retrieved":"2026-11-22","notes":"Approvals from 1 Jan 2013: kWp x 1600, no other cap (FIT table and REWS FAQ 6). Excess paid at Enemalta's proxy market price."},"proxy_market_price":{"value":null,"status":"unverified","source":"https://www.rews.org.mt/consumer-information/feed-in-tariffs-schemes/","retrieved":"2026-11-22","notes":"Paid for exports above the cap or with no FiT. REWS says it is announced annually; no current figure found. Leave as user input."},"allocation_validity_months":{"value":12,"status":"verified","source":"https://www.rews.org.mt/services/authorisation-and-notification-pvs-feed-in-tariff-40-kwp/","retrieved":"2026-11-22","notes":"One-time extension possible at the FiT available on the extension date; FIT table note 3: extensions to capacity not covered by a scheme at original FiT minus 0.5c."},"fit_tax":{"value":"income-tax and VAT exempt for households","status":"verified","source":"https://www.rews.org.mt/consumer-information/feed-in-tariffs-schemes/","retrieved":"2026-11-22","notes":"REWS FAQ 15."},"export_options":{"value":["sell all generation (pay all consumption)","self-consume, export surplus"],"status":"verified","source":"https://www.rews.org.mt/consumer-information/feed-in-tariffs-schemes/","retrieved":"2026-11-22","notes":"REWS FAQ 7-8, 16; switch via ARMS Form R."},"net_metering":{"value":"closed","status":"verified","source":"https://www.rews.org.mt/consumer-information/feed-in-tariffs-schemes/","retrieved":"2026-11-22","notes":"Not available to PV approved after 10 Sep 2010; no switch from net metering to FiT since Aug 2015 (FAQ 18-19)."}},"grant_2026_RES":{"status":{"value":"closed","status":"verified","source":"https://www.rews.org.mt/schemes/2026-renewable-energy-sources-scheme/","retrieved":"2026-11-22","notes":"Call 2026/RES (GN 597 of 2026). Options B and C closed to new Part A from 13 Jul 2026 (GN 1060 of 2026); whole call closed from 12 Sep 2026 (Government Notice of 4 Sep 2026). Leaflet date 'end of November 2026' superseded. No 2027 call on rews.org.mt on retrieval date."},"pv_hybrid_inverter":{"value":{"share":0.65,"cap_per_system":3000,"cap_per_kwp":645},"unit":"EUR","status":"verified","source":"https://www.rews.org.mt/schemes/2026-renewable-energy-sources-scheme/","retrieved":"2026-11-22","notes":"Option A, PV system with hybrid inverter. Leaflet misprints the per-kWp cap as '€645/Wp'."},"battery":{"value":{"share":0.75,"cap_per_system":6000,"cap_per_kwh":600},"unit":"EUR","status":"verified","source":"https://www.rews.org.mt/schemes/2026-renewable-energy-sources-scheme/","retrieved":"2026-11-22"},"hybrid_inverter_option_B":{"value":{"cap_per_system":1800,"cap_per_kwp":350},"unit":"EUR","status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/v6RES-leaflet-2026.pdf","retrieved":"2026-11-22","notes":"Leaflet only. Option B open to existing PV connected for at least 6 years."},"nzia_bonus":{"value":0.05,"status":"unverified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/v6RES-leaflet-2026.pdf","retrieved":"2026-11-22","notes":"Leaflet: '+5% NZIA financial compensation'. Whether +5 percentage points or 5% of the grant is not stated."},"grant_excludes_fit":{"value":true,"status":"verified","source":"https://www.rews.org.mt/schemes/2026-renewable-energy-sources-scheme/","retrieved":"2026-11-22","notes":"'provided that the photovoltaic installation has no active feed-in tariff allocation'."},"eligible_cost_incl_vat":{"value":true,"status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/Guidelines-for-Applicants-2026-RES.pdf","retrieved":"2026-11-22","notes":"Guidelines: total expenditure is the sum of costs including VAT, less discounts, extended warranty and import duty."},"min_size":{"value":{"pv_kw":">1","battery_kwh":">2"},"status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/Guidelines-for-Applicants-2026-RES.pdf","retrieved":"2026-11-22"},"durability_years":{"value":5,"status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/04/Guidelines-for-Applicants-2026-RES.pdf","retrieved":"2026-11-22","notes":"System must stay installed, grid-connected and operating for 5 years after payment; 10-year system warranty required."},"install_deadline_months":{"value":8,"status":"verified","source":"https://www.rews.org.mt/schemes/2026-renewable-energy-sources-scheme/","retrieved":"2026-11-22"},"previous_round":{"value":{"pv_standard_inverter":{"share":0.5,"cap":2500,"cap_per_kwp":625},"pv_hybrid":{"share":0.5,"cap":3000,"cap_per_kwp":750},"battery":{"share":0.8,"cap":7200,"cap_per_kwh":720}},"status":"verified","source":"https://www.rews.org.mt/press-release-by-the-regulator-for-energy-and-water-services/","retrieved":"2026-11-22","notes":"Historic. REWS page is dated 13 Mar 2025 but its text describes the round opening 23 Feb 2024 (EUR 4.8m, ITB calls in 2024). Do not label these as 2025 terms without a 2025 primary source."}},"grid_co2":{"enemalta_2025":{"value":364,"unit":"gCO2/kWh","year":2025,"status":"verified","source":"https://www.enemalta.com.mt/2016/02/25/fuel_mix_for_energy_distribution/","retrieved":"2026-11-22","notes":"Provisional. Supplier disclosure under S.L.545.34: electricity supplied by Enemalta incl. interconnector imports (33.45%); on-site self-consumed PV not included. Same table in REWS 2026 Monitoring Report."},"enemalta_2024":{"value":380,"unit":"gCO2/kWh","year":2024,"status":"verified","source":"https://www.enemalta.com.mt/2016/02/25/fuel_mix_for_energy_distribution/","retrieved":"2026-11-22"},"notes":"Direct (combustion) factor of the average supply mix, not a marginal or lifecycle factor."},"household_consumption":{"households_electricity_2024":{"value":1086.336,"unit":"GWh","status":"verified","source":"https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nrg_bal_c?geo=MT&nrg_bal=FC_OTH_HH_E&siec=E7000&unit=GWH","retrieved":"2026-11-22","notes":"Eurostat energy balance, households final energy use. Whether rooftop PV self-consumption is included was not checked."},"households_count_2024":{"value":235.3,"unit":"thousand","status":"verified","source":"https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/lfst_hhnhtych?geo=MT","retrieved":"2026-11-22"},"avg_per_household_2024":{"value":4617,"unit":"kWh/yr","status":"derived","formula":"1086.336 GWh / 235,300 households","source":"https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nrg_bal_c?geo=MT&nrg_bal=FC_OTH_HH_E&siec=E7000&unit=GWH","retrieved":"2026-11-22"},"avg_per_household_meter_2024":{"value":3273,"unit":"kWh/yr","status":"derived","formula":"1086.336 GWh / 331,876 household active meters (Enemalta via REWS 2026 Monitoring Report)","source":"https://www.rews.org.mt/wp-content/uploads/2026/09/2026-Malta-National-Report.pdf","retrieved":"2026-11-22","notes":"Meters include second homes and vacant dwellings, so this is lower than per occupied household."},"regulator_reference":{"value":3500,"unit":"kWh/yr","status":"verified","source":"https://www.rews.org.mt/wp-content/uploads/2026/09/2026-Malta-National-Report.pdf","retrieved":"2026-11-22","notes":"Reference bill used by REWS (Eurostat band DC, 2500-4999 kWh). A convention, not a measured average."}},"pv_losses":{"pvgis_system_loss_default":{"value":14,"unit":"%","status":"verified","source":"https://joint-research-centre.ec.europa.eu/document/download/2e914f8c-616a-4e6d-b655-e9f2233ff746_en?filename=PVGIS+6+Step-by-Step+Basics+2026_0.pdf","retrieved":"2026-11-22","notes":"PVGIS system loss covers cabling, inverter (DC to AC), dust and long-term degradation. Temperature, irradiance, angle-of-incidence and spectral effects are modelled separately by PVGIS."},"lower_loss_variant":{"value":10,"unit":"%","status":"unverified","notes":"Assumption chosen for this project: a new, clean, unshaded system with a modern inverter. Not a published figure. PVGIS applies system loss as a flat factor, so yield scales by (1-L)/(1-0.14)."},"pvwatts_breakdown":{"value":{"soiling":2,"shading":3,"mismatch":2,"wiring":2,"connections":0.5,"light_induced_degradation":1.5,"nameplate":1,"availability":3,"total":14.08},"unit":"%","status":"verified","source":"https://www.osti.gov/servlets/purl/1158421","retrieved":"2026-11-22","notes":"NREL PVWatts v5 manual (Dobos 2014, NREL/TP-6A20-62641) Table 6. PVWatts models the inverter separately (nominal 96%), so its 14% is not the same bucket as PVGIS's 14%."},"soiling":{"value":{"low":2,"high":6},"unit":"% per year","status":"range","source":["https://www.osti.gov/servlets/purl/1158421","https://iea-pvps.org/wp-content/uploads/2023/01/IEA-PVPS-T13-21-2022-REPORT-Soiling-Losses-PV-Plants.pdf"],"retrieved":"2026-11-22","notes":"PVWatts default 2%; IEA-PVPS T13-21:2022: annual soiling loss 5.86% in Crete, mean daily 4.4% in Malaga, 'at least 3-4%' globally. No Malta measurement found."},"temperature_malta":{"value":{"malta":-6.17,"gozo":-6.02},"unit":"% of annual energy, S 30 deg, free-standing","status":"verified","source":"PVGIS v5.3 PVcalc outputs.totals.fixed.l_tg (data/raw/pvcalc_*_loss14_t30_a0.json)","retrieved":"2026-11-22","notes":"Temperature and low-irradiance loss modelled by PVGIS. Same files: angle-of-incidence -2.59/-2.62%, spectral +0.46/+0.50%, total incl. 14% system loss -21.03/-20.90%. Roof-mounted modules with little ventilation run hotter than PVGIS's free-standing case."},"inverter_efficiency":{"value":{"low":96.8,"high":98.6},"unit":"%","status":"range","source":["https://krannich-solar.com/fileadmin/user_upload/global/datasheets/Fronius/SE_DS_Fronius_Primo_GEN24_Plus_EN.pdf","https://solar.huawei.com/-/media/Solar/attachment/pdf/eu/datasheet/FusionSolar_Residential_Commercial_Datasheet.pdf"],"retrieved":"2026-11-22","notes":"Fronius Primo GEN24 Plus European efficiency 96.8-97.2%; Huawei SUN2000 residential max efficiency 98.2-98.6%. Already inside PVGIS's 14%."},"module_temp_coefficient":{"value":-0.29,"unit":"%/K of Pmax","status":"verified","source":"https://jinkosolar.eu/wp-content/uploads/JKM425-445N-54HL4R-B-F2-EN-3.pdf","retrieved":"2026-11-22","notes":"Example datasheet (Jinko Tiger Neo 54HL4R-B). PVGIS uses its own c-Si model."}},"degradation":{"field_median":{"value":0.5,"unit":"%/yr","status":"verified","source":"https://www.osti.gov/biblio/1045052","retrieved":"2026-11-22","notes":"Jordan & Kurtz, Photovoltaic Degradation Rates - An Analytical Review, Prog. Photovolt. 2013 (NREL/JA-5200-51664): median 0.5%/yr, mean 0.8%/yr over ~2000 reported rates."},"warranty_linear":{"value":{"first_year":{"low":1,"high":1.5},"annual_after":0.4},"unit":"%","status":"range","source":["https://www.solar4ever.com.au/Brochures/LonGi%20-%20LR5-54HTH-440M.pdf","https://jinkosolar.eu/wp-content/uploads/JKM425-445N-54HL4R-B-F2-EN-3.pdf","https://www-cdn.trinasolar.com/wwwstorage/sites/7/eu-260224-datasheet-vertex-s-neg9r.28-en-2026-a-web-260224-datasheet-vertex-s-neg9r.28-en-2026-a-web.pdf"],"retrieved":"2026-11-22","notes":"LONGi Hi-MO 6: <1.5% first year, 0.40%/yr; Trina Vertex S+ NEG9R.28: 1% first year, 0.4%/yr; Jinko Tiger Neo: 0.40%/yr over 30 years. Warranty limits, not measured rates."},"default":{"value":0.5,"unit":"%/yr","status":"verified","notes":"Use the field median; let the user change it."}},"battery":{"round_trip_pv_to_grid":{"value":0.89,"status":"verified","source":"https://nyssf.com/wp-content/uploads/2024/02/PowerWall-3_datasheet.pdf","retrieved":"2026-11-22","notes":"Tesla Powerwall 3 datasheet: solar-to-battery-to-grid 89%, solar-to-grid 97% (CEC method). Relative to AC surplus: 0.89/0.97 = 0.918."},"battery_efficiency_htw":{"value":{"mean":95.7,"low":87.9,"high":97.8},"unit":"%","status":"verified","source":"https://solar.htw-berlin.de/wp-content/uploads/HTW-Stromspeicher-Inspektion-2025.pdf","retrieved":"2026-11-22","notes":"HTW Berlin Stromspeicher-Inspektion 2025, 22 lithium-ion systems, battery only (excl. power electronics). Mean discharge path BAT2AC 95.7% (21 systems); best charge path PV2BAT 98.2%."},"round_trip_range":{"value":{"low":0.8,"high":0.94},"status":"range","formula":"low 0.879 x 0.912 = 0.80 (lowest battery and lowest BAT2AC in HTW, charge path not included, so real low is lower); high 0.978 x 0.980 x 0.982 = 0.94 (best battery, BAT2AC and PV2BAT in HTW)","source":"https://solar.htw-berlin.de/wp-content/uploads/HTW-Stromspeicher-Inspektion-2025.pdf","retrieved":"2026-11-22","notes":"Indicative only: extremes come from different systems. Tool default is 0.918 relative to AC surplus."},"byd_rte":{"value":0.96,"status":"verified","source":"https://krannich-solar.com/fileadmin/user_upload/global/datasheets/BYD/BYD_Battery-Box-premium-hvs-hvm_datasheet_v1.5_en.pdf","retrieved":"2026-11-22","notes":"BYD Battery-Box Premium HVS datasheet: round-trip >=96% (battery DC side only)."},"depth_of_discharge":{"value":1,"status":"verified","source":["https://krannich-solar.com/fileadmin/user_upload/global/datasheets/BYD/BYD_Battery-Box-premium-hvs-hvm_datasheet_v1.5_en.pdf","https://ske-solar.com/productdata/LUNA2000-S1/01_Datasheets/DataSheet_LUNA2000-7-14-21-S1_V01_2024-06_EN.pdf"],"retrieved":"2026-11-22","notes":"BYD and Huawei LUNA2000 datasheets state usable energy at 100% DoD. Use the datasheet usable kWh as the input, not nominal."},"warranty_years":{"value":10,"status":"verified","source":["https://nyssf.com/wp-content/uploads/2024/02/PowerWall-3_datasheet.pdf","https://krannich-solar.com/fileadmin/user_upload/global/datasheets/BYD/BYD_Battery-Box-premium-hvs-hvm_datasheet_v1.5_en.pdf"],"retrieved":"2026-11-22"},"capacity_fade":{"value":null,"status":"unverified","notes":"No independent field fade rate sourced."}},"roof_area":{"module_area_per_kwp":{"value":{"low":4.21,"high":4.7},"unit":"m2/kWp","status":"derived","formula":"module length x width / rated power","source":["https://www.solar4ever.com.au/Brochures/LonGi%20-%20LR5-54HTH-440M.pdf","https://jinkosolar.eu/wp-content/uploads/JKM425-445N-54HL4R-B-F2-EN-3.pdf","https://www-cdn.trinasolar.com/wwwstorage/sites/7/eu-260224-datasheet-vertex-s-neg9r.28-en-2026-a-web-260224-datasheet-vertex-s-neg9r.28-en-2026-a-web.pdf"],"retrieved":"2026-11-22","notes":"LONGi LR5-54HTH 440-450 W 1722x1134 mm: 4.44-4.34; Jinko JKM425-445N-54HL4R-B 1762x1134 mm: 4.70-4.49; Trina TSM-NEG9R.28 450-475 W 1762x1134 mm: 4.44-4.21."},"flat_roof_row_spacing":{"value":{"tilt10":0.783,"tilt20":0.659,"tilt30":0.585},"unit":"ground cover ratio (module length / row pitch)","status":"derived","formula":"GCR = 1 / (cos b + sin b / tan h), h = 90 - 35.90 - 23.44 = 30.66 deg (sun elevation at solar noon on the winter solstice)","notes":"Geometry only; design criterion 'no inter-row shading at noon on 21 Dec' is a choice, not a rule. Roof area per kWp = module area per kWp / GCR, e.g. 4.44/0.585 = 7.6 m2 at 30 deg. Parapet setbacks, access paths and water tanks are not included."}},"installed_cost":{"value":null,"status":"unverified","notes":"No primary source for Maltese installed prices. User input only; no placeholder default."},"yield_reference":{"value":{"malta_S30":1633.7,"malta_flat":1452,"malta_E30":1347.1,"gozo_S30":1676.3,"malta_optimum":{"tilt":31,"azimuth":0,"annual":1634},"gozo_optimum":{"tilt":32,"azimuth":3,"annual":1677.3}},"unit":"kWh/kWp/yr, loss 14%","status":"verified","source":"PVGIS v5.3 raw files, see data/SOURCES.md","retrieved":"2026-11-22","notes":"Sensitive to the exact point: PVGIS cells near the coast differ by a few percent."}}